day05_part1

Violin Plot

Violin Plot

This chart shows the relationship between function/parameter and iteration time. The thickness of the shaded region indicates the probability that a measurement of the given function/parameter would take a particular length of time.

day05_part1/Loop_until_length_does_not_change

PDF of Slope Regression

day05_part1/Loop_until_length_does_not_change_and_parallel_part_2

PDF of Slope Regression

day05_part1/Explicit_loop

PDF of Slope Regression

day05_part1/Loop_until_length_does_not_change_using_Iterator_fold

PDF of Slope Regression

day05_part1/Loop_until_length_does_not_change_using_Iterator_scan

PDF of Slope Regression

day05_part1/Stack

PDF of Slope Regression